Click on a picture below to view the photo gallery
-
Sustainable construction techniques and materials were used throughout the project.
-
-
SIP wall panels being prepped for installation.
-
Second floor rough framing completed.
-
Rough framing is completed.
-
Insulated concrete forms were used for all building concrete walls.
-
-
SIP panels were used for all above-ground construction.